City of Brentwood
Home PageContact Us!Back

Public Works                                                                                                                         

 
Public Works - Operations Division - Wastewater Treatment
Home Public Works Operations Division Wastewater Treatment
About Us

The City of Brentwood Wastewater Treatment Plant receives wastewater from over 16,000 connections, through approximately 190 miles of sewer mains and lateral connections. The plant utilizes an oxidation ditch process and has a capacity to treat 5.0 million gallons of wastewater per day (MGD). The plant discharges treated, and disinfected effluent into Marsh Creek that meets or exceeds CA Title 22 drinking water standards. A portion of the treated water is recycled and used on landscaping, parks and some businesses. The treatment plant was designed and built to allow the City to expand to an average dry weather flow of 10 MGD for the build out of the city.

As the City grows with well planned direction, so does the state-of-the-art Wastewater Treatment Facility. With the ability to expand when needed to meet the future development of the City, Brentwood is poised with the ability to provide service for its businesses and residents into the future.

Construction of 5 MGD Wastewater Treatment Plant
Cascade Aerator

Programs and Information
Resources
Frequently Asked Questions

Service Request
Report a Problem

Abandoned shopping carts garbage / recycle service, graffiti, potholes, street lights, traffic, water leak, etc.

After Hours Water or Sewer Emergency contact Police Dispatch (925) 778-2441

Quick Links

Other Resources

Key Personnel
Wastewater Operations Manager
Casey Wichert

Wastewater Treatment Plant Supervisor
Kris Vickers

Public Works Staff

Public Works Department
Wastewater Division       (925) 516-6060
2251 Elkins Way       (925) 516-6061
Brentwood, CA 94513       dept-pubwork@brentwoodca.gov
Hours of Operation:
Monday - Friday       7:00 am - 3:30 pm