CITY COUNCIL AGENDA ITEM NO. 15


Meeting Date: February 13, 2001

Subject/Title: Award of Contract to Leighton Construction Inc. for Roadway Improvements to Beverly Place and Walnut Boulevard

Submitted by: Engineering: John E. Stevenson/S. Gronlund

Approved by: Jon Elam, City Manager


RECOMMENDATION
Authorize the City of Brentwood to award a contract to Leighton Construction Inc. in the amount of $37,245.00 for the construction of roadway improvements at the end of Beverly Place and construct an asphalt sidewalk along Walnut Boulevard from the BART Park-N-Ride Lot to Central Boulevard, and authorize the City Manager to execute change orders up to 10% of the contract amount.

PREVIOUS ACTION
On September 26, 2000 by Resolution 2164, the City Council awarded a construction contract to American Asphalt Repair & Resurfacing Co. Inc. in the amount of $366,979.95 for the Base Bid, and Alternates A, B and D; to grant the City Manager authority to execute change orders up to 10% the contract amount; and authorize an increase in the budget by $400,000.

BACKGROUND
Beverly Lane Extension
Currently, the roadway improvements for Beverly Place do not go to the end of the street; it stops 100 feet short of it. The residents of Beverly Place have voiced concerns to the City that this dirt roadway section has created a nuisance of dust and mud when vehicles, including the City garbage trucks, must turn around at the end of the street. Authorizing this contract will provide the residents with a paved roadway eliminating these nuisances. Three estimates were received and Leighton Construction Inc. was the lowest at $24,235. Including a 10% contingency fund, the total expenditure for this work will be $26,658.50. This roadway improvement work can be funded from the Pavement Management Program (CIP No. 336-3083 00/01) fund.

Walnut Boulevard Sidewalk 
The construction of this temporary sidewalk will provide a pedestrian connection from the existing Walnut Boulevard sidewalk to the temporary sidewalk south of Central Boulevard. Upon completion of the future police station, a permanent sidewalk will be constructed at that time. Three estimates were received and Leighton Construction Inc. was the lowest at $13,010. Including a 10% contingency fund, the total expenditure for this work will be $14,311.00. Since this work is a temporary facility, roadway fees cannot be utilized; therefore, funding should come from the General Fund.

The following list shows the results of the submitted estimates:

Company Location Beverly Lane Extension Walnut Blvd. Sidewalk
Leighton Construction Byron $24,235 $13,010
McCullough Co. Antioch $27,895 $19,769
American Asphalt Hayward $39,375 $50,100


Attachments:
Resolution
Site Maps
Agreement

RESOLUTION NO. 


A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BRENTWOOD AWARDING A CONSTRUCTION CONTRACT TO LEIGHTON CONSTRUCTION INC. IN THE AMOUNT OF $37,245.00 FOR THE CONSTRUCTION OF ROADWAY IMPROVEMENTS AT THE END OF BEVERLY PLACE AND FOR CONSTRUCTION OF A TEMPORARY ASPHALT SIDEWALK ALONG WALNUT BOULEVARD FROM THE BART PARK-N-RIDE LOT TO CENTRAL AVENUE AND AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDERS UP TO TEN PERCENT (10%) OF THE CONTRACT AMOUNT


WHEREAS, on September 26, 2000 by Resolution 2164, the City Council awarded a construction contract to American Asphalt Repair and Resurfacing Company Inc. in the amount of $366,979.95 for the Base Bid and Alternates A, B and D; granted the City Manager authority to execute change orders up to 10% to the contract amount; and authorized an increase in the budget by $400,000; and

WHEREAS, the residents of Beverly Place have voiced concerns regarding the nuisance of an unpaved portion at the end of their street; and the funding for this work shall come from the 2000/2001 Pavement Management Program fund; and

WHEREAS, a temporary sidewalk will provide a pedestrian connection along Walnut in-between existing sidewalks on Walnut Boulevard and Central Avenue; and the funding for this work shall come from the General Fund; and

WHEREAS, the City received three estimates for this work, and Leighton Construction Inc. was the lowest bidder.

NOW, THEREFORE BE IT RESOLVED that the City Council awards a construction contract to Leighton Construction Inc. in the amount of $37,245.00 for the construction of roadway improvements at the end of Beverly Place and for construction of a temporary asphalt sidewalk along Walnut Boulevard from the BART Park-N-Ride Lot to Central Avenue.

BE IT FURTHER RESOLVED that the Council authorizes the City Manager to execute change orders up to ten percent (10%) the contract amount.

BE IT FURTHER RESOLVED that the Council authorizes the funding for the Beverly Place Roadway Extension portion of work to come from the 2000/2001 Pavement Management Program, CIP No. 336-3083 00/01 ($24,235, plus 10% for contingencies); and authorizes the funding for the Walnut Boulevard Sidewalk portion of work to come from the General Fund ($13,010.00, plus 10% for contingencies).

PASSED, APPROVED AND ADOPTED by the City Council of the City of Brentwood at a regular meeting held on the13th day of February, 2001 by the following vote:

AYES: Councilmembers
NOES: 
ABSENT: 

Top of Page