CITY COUNCIL AGENDA ITEM NO. 20

Meeting Date:  June 27, 2000

Subject/Title:    Award of the Construction Contract for the Wastewater Treatment Plant Expansion Project

Submitted by:   Engineering: J. Stevenson/P. Eldredge

Approved by:    Jon Elam, City Manager

RECOMMENDATION

Award the construction contract for the Wastewater Treatment Plant Expansion Project, CIP Project No. 592-5911, to S.J. Amoroso Construction Co., Inc. and Pacific Mechanical Corporation, a Joint Venture, and authorize the City Manager to execute the agreement and necessary documents in the amount of $39,272,135.00, which includes bid alternates A, B1, B3 and C and grant the City Manager authority to execute change orders up to 10% of the contract amount.

PREVIOUS ACTION

On November 24, 1998, by Resolution No. 98-209, the City Council approved the certification of the Environmental Impact Report for the Wastewater Treatment Plant Expansion with Discharge to Marsh Creek.

On February 9, 1999, by Resolution 99-58, the City Council directed staff to proceed with the design of the tertiary sewage treatment plant expansion.

On March 9, 1999, by Resolution No. 99-72, the City Council adopted the Mitigation Monitoring Plan and Findings of Fact for the City of Brentwood Wastewater Treatment Plant Expansion with Discharge to Marsh Creek and directed Staff to file a Notice of Determination (NOD) with the Contra Costa County Clerk's Office.

On March 23, 1999, by Resolution No. 99-77, the City Council approved the agreement between G.S. Dodson & Associates, Consulting Engineers, and the City of Brentwood to provide professional design services for the Wastewater Treatment Plant Expansion.

On June 8, 1999, by Resolution No. 99-146, the City Council approved the agreement between Camp Dresser & McKee, Inc. and the City of Brentwood to provide value engineering services for the Wastewater Treatment Plant Expansion Project including but not limited to reviews and design reports at the 10% and 50% design stage.

On December 14, 1999, by Resolution No. 99-255, the City Council approved the agreement between The Covello Group, Inc. and the City of Brentwood to provide Construction Management services for the Wastewater Treatment Plant Expansion Project.

On April 25, 2000, by Resolution No. 2060, the City Council designated John Stevenson and Paul Eldredge as the City’s authorized representatives to the State Water Resources Control Board’s State Revolving Fund Loan Program.

On May 23, 2000, by Resolution No. 2083, the City Council authorized the City Engineer to enter into an agreement with the United States Geological Survey (USGS) for the installation of a gauging station on Marsh Creek

BACKGROUND

At the bid opening on June 15 a total of four (4) bids were received.  The bids were reviewed and the lowest responsive, responsible bid was received from S.J. Amoroso Construction Co., Inc. and Pacific Mechanical Corporation, a Joint Venture, in the amount of $39,272,135.00.

The 4 bids were:

1.      S.J. Amoroso / Pacific Mechanical                       $39,272,135.00

2.      Walsh Pacific                                                     $39,975,537.00

3.      Monterey Mechanical                                          $41,610,000.00

4.      Kiewit Pacific                                                     $45,575,000.00

Staff is exploring all options to reduce the cost of the plant without jeopardizing reliability, capacity or functionality and will continue to do so with the contractor should the contract be awarded. We have already seen the benefits of cost reduction engineering on this project due to he last minute re-design to allow the use of rock columns vs. piles. All of he bidders elected to bid rock columns instead of the piles and it is estimated that this change saved the City approximately $700,000.00

The Fiscal Year (FY) 99/00 budget contains funds for the Wastewater Treatment Plant Expansion Project, CIP Project No. 592-5911, in the amount of $43,606,500.  The majority is to be funded from a 0% interest loan from the State Water Resources Control Board’s State Revolving Fund Loan Program (SWRCB).  The amount shown for the low bid is over the amount estimated when the loan was secured with the State; however, it is well within the loan authorization of the SWRCB staff.

Attachment:

Site Map

Agreement

City Administration
City of Brentwood City Council
150 City Park Way
Brentwood, CA 94513
(925) 516-5440
Fax (925) 516-5441
E-mail allcouncil@brentwoodca.gov